Mission family

Ship to production with pre-verified rollback

Release & operations missions gate production deployments with evidence checkpoints, ensuring every rollout has validated rollback paths before it starts.

Planned

No Release & operations Mission Pack is available today. The control matrix below is a planned architecture design.

Outcome shape

Deploy to production with confidence in rollback safety

Gate control matrix

Approval gates and their rollback procedures are declared per stage, not hardcoded into a single deployment script.

Release gate stages and their governing controls
Gate stageWhat must be true to advance
planningDefine rollout gates and rollback criteria
stagingValidate in staging environment
canaryLimited production exposure
rolloutFull production deployment
verificationConfirm success with rollback ready
  • Control matrix: Gates arranged by environment and stage
  • Rollout lanes: Parallel deployment tracks with independent gates

Required capabilities

Reference missions

Constraints

  • Rollback must be verified before rollout starts
  • Canary stage required for production deployments
  • Evidence of success required at each gate

See how evidence and recovery connect