Missions / Release & operations

Gated production rollout with pre-verified rollback

Production deployment completed with evidence of canary success and rollback readiness

Planned

This mission is planned. No implementation exists today.

Architecture summary

Release is gated through staging, canary, and production stages. Rollback path is verified before canary starts. Evidence verification captures success metrics at each gate.

Stages

  1. Rollback preparation

    Verify rollback path is executable before rollout

    Evidence: Rollback procedure with dry-run verification

  2. Staging validation

    Deploy to staging and run validation suite

    Evidence: Staging validation results

  3. Canary deployment

    Deploy to limited production subset

    Evidence: Canary exposure percentage

  4. Canary verification

    Verify canary meets success criteria

    Evidence: Canary metrics comparison

  5. Production rollout

    Complete deployment to full production

    Evidence: Production deployment timestamp

  6. Post-deployment verification

    Confirm production health

    Evidence: Production health metrics

Controls

  • Rollback gate

    Rollback must be verified before canary

  • Canary gate

    Canary success required before full rollout

  • Observability gate

    Metrics must be within bounds at each stage

Composition

Capabilities used
context-intelligence, execution-agents, evidence-verification
Integration categories used
ci-cd, cloud-provider, observability

Constraints

  • Rollback verification is prerequisite
  • Canary percentage and duration configurable
  • Automatic rollback on gate failure

Related design notes

  • Rollback-first design ensures safety
  • Observability integration for real-time metrics
  • Designed for Kubernetes and cloud deployment