Missions / Release & operations
Gated production rollout with pre-verified rollback
Production deployment completed with evidence of canary success and rollback readiness
This mission is planned. No implementation exists today.
Architecture summary
Release is gated through staging, canary, and production stages. Rollback path is verified before canary starts. Evidence verification captures success metrics at each gate.
Stages
Rollback preparation
Verify rollback path is executable before rollout
Evidence: Rollback procedure with dry-run verification
Staging validation
Deploy to staging and run validation suite
Evidence: Staging validation results
Canary deployment
Deploy to limited production subset
Evidence: Canary exposure percentage
Canary verification
Verify canary meets success criteria
Evidence: Canary metrics comparison
Production rollout
Complete deployment to full production
Evidence: Production deployment timestamp
Post-deployment verification
Confirm production health
Evidence: Production health metrics
Controls
Rollback gate
Rollback must be verified before canary
Canary gate
Canary success required before full rollout
Observability gate
Metrics must be within bounds at each stage
Composition
- Capabilities used
- context-intelligence, execution-agents, evidence-verification
- Integration categories used
- ci-cd, cloud-provider, observability
Constraints
- Rollback verification is prerequisite
- Canary percentage and duration configurable
- Automatic rollback on gate failure
Related design notes
- Rollback-first design ensures safety
- Observability integration for real-time metrics
- Designed for Kubernetes and cloud deployment